Altron starts 2019 with a continuing heavy involvement in the roll out of Utilities infra-structure security
15th Jan 2019We continue our major presence in the on-going roll-out of security upgrades covering the utilities sector in the UK, particularly with electricity transmission substations and waste and water treatment sites.
With the widest and most comprehensive range of CCTV camera mounting products on the market, most of which can be adapted for high loading multiple use applications, we are able to provide mounting solutions for the many varied types of installation required to secure utilities sites.
The product variations we commonly supply are:-
- ANCT nested towers, with upgraded capacity
- Tilt-down cabinet based poles, both standard and heavy duty
- ACC tilt-down columns and AW1697 cabinet based columns
- AW1934 wall poles and AW4772 high loading wall poles
- Ancillary products such a PIR mounting posts and bollards and car park entry pedestals
All of these products can be adapted to mount other equipment such as lighting, speakers and PIR sensors etc,
Our in-house software enables us to easily verify product loading for individual sites and provide revised foundations sizes.
This is all backed up with full technical support and product training along with ongoing product development, providing continued confidence in the use of Altron CCTV mounting products.
Our knowledge and experience in this sector has enabled us to transfer this success to similar infrastructure sites in worldwide markets with ever greater coverage.